Website redesign, San Giovanni Lupatoto: from a dated site to one that opens fast
The typical site in town is the one a company paid for once and left as it was: 63.4% still load jQuery, 35.5% are on WordPress and more than one site in four is built with a page builder. Our studio in San Giovanni Lupatoto rebuilds existing sites at a fraction of what an agency charges: the content that works stays, the code is new and fast, and old addresses are redirected one by one.
When is it worth rebuilding a website in San Giovanni Lupatoto?
When the site opens slowly, reads badly on a phone, or every change costs an invoice. If the content is good and the code is not, a redesign keeps the first and replaces the second, without starting from zero.
If instead the site no longer works because its goals were wrong, we tell you and propose a new site.
- An analysis of the current site: what to keep, what to rewrite, what to drop.
- A new design on your brand, planned for the phone first.
- New light code, with no plugins and no page builder.
- Old addresses kept or redirected one by one, so your Google positions are not lost.
- A switch to production with no hours of the site being down.
What does it cost to rebuild an existing site?
Redesigning a complete site or a landing page costs a fraction of what an agency charges, with state of the art work, in about a week. Further down: the options and the monthly plans.
Landing Page
We completely rebuild your pages using cutting-edge technology, starting from your existing landing page. We recommend this service when your pages are difficult to maintain or update, slow, unattractive, not mobile friendly, or missing SEO fundamentals entirely.
Full Website
If your existing website is built on outdated, slow technology, is missing SEO fundamentals entirely, or has an unattractive design that isn't mobile friendly, this package is for you. It puts back the technical and SEO foundations your site needs to compete on Google and in LLM answers.
And after delivery?
Once the final payment is settled, the site is fully yours. The monthly plans are optional and can be canceled whenever you like: they're for people who'd rather not think about hosting, continuous SEO checks and improvements, security and updates.
Basic Maintenance
This plan includes all your company needs to have an effective online presence. SEO monitoring, security, monthly reports and our full support. It also covers sites we didn't build: same price, hosting excluded.
Learn moreHosting only
The simplest plan: your site stays online and fast on the same infrastructure we use for every project, and every month you get a 30 minute call with us. SEO, edits and optimizations stay out.
Learn moreActive Maintenance
Everything from Basic Maintenance, plus any feature you request and any page you request. The price starts at this figure and is settled on the workload we agree together.
Learn moreActive SEO Development
Everything from Basic Maintenance, plus SEO development of existing and new pages, Google Ads and Meta campaigns, conversion testing and Google Business Profile management, reviews included. Ad budget not included. First results after 4 to 6 months; the price starts at this figure and is settled on the workload we agree.
Learn moreThe whole service is on the website redesign page.
Prices include VAT and are starting prices: they depend on how many pages we rebuild.
Old sites running fast again
Ricerca Perdite 1972 and Bikenergy: sites rebuilt from what was there, keeping the content that worked and writing new code.
How dated are the town's websites?
A site's technology tells you when it was built and who looks after it. We read which tools every working website in town loads.
- sites that load jQuery
- 63.4%
- 291 of 459: a library born before smartphones, still on most pages.
- sites carrying the jQuery Migrate bridge
- 32.2%
- 148 sites keep a piece of compatibility for old code: the sign of a site half updated.
- sites built with a page builder
- 27.5%
- Elementor on 12.2% and WPBakery on 7%: handy to assemble, heavy to load.
- of JavaScript downloaded by the home page
- 674 kB
- That is the median: a rebuilt site with less code downloads a fraction of it.
Technologies detected on the working websites in the San Giovanni Lupatoto report, October 2026: 448 sites with at least one recognised technology, out of 470 distinct ones.
The figures come from Overture Maps listings: many businesses are not mapped or do not list a website, so the shares describe the listings, not every business in the town. How we read the data.
What is inside the town's websites?
The most common and oldest technologies, with the share of sites that use them. It is not a fault: it is the signal that a site needs rebuilding when the code is no longer new but the content still is.
jQuery is in the code of nearly two sites in three
jQuery is on 63.4% of sites, WordPress on 35.5%, jQuery Migrate on 32.2%, jQuery UI on 23.3%, Bootstrap on 22.9%, Elementor on 12.2% and WPBakery on 7%.
Sites with jQuery have an average speed score of 61.8, against 63.1 for all. It is not the library alone that weighs: it is the site around it, built in layers over the years. A redesign strips the layers and keeps what works.
- San Giovanni Lupatoto
- Average of 80 cities in Italy
| jQuery | 63.4% | 62.4% |
|---|---|---|
| WordPress | 35.5% | 40.3% |
| jQuery Migrate | 32.2% | 37.6% |
| jQuery UI | 23.3% | 23.1% |
| Bootstrap | 22.9% | 19.4% |
| Elementor | 12.2% | 13.3% |
| WPBakery | 7% | 6.1% |
The typical local site before and after a redesign
The left column summarises the town's websites; the right one shows how the sites we built and measured perform.
| What we measure | The typical San Giovanni Lupatoto site | An NFW Web Studio site |
|---|---|---|
| Phone speed (Lighthouse score) | 63.1 out of 100 on average | 93 and 95 on our sites |
| JavaScript loaded by the home page | 674 kB (median) | 237 kB and 354 kB |
| Delay before the rebuilt home page shows its content | 7.6 seconds (median) | 2.8 s and 2.9 s |
| Sites with a page builder | 27.5% | None: code written for you and owned by you |
| What happens to the old URLs | Depends on who rebuilds the site | Preserved or forwarded to the new page, one by one |
The town is the October 2026 report; our column is the home pages of nfw.run and bikenergy.com, measured on October 4 and 5, 2026 with the same tool.
Our other services in San Giovanni Lupatoto
The same service in towns near San Giovanni Lupatoto
What owners of dated sites ask us
Let's look at the site you have.
Half an hour on your current site, at our place or yours: we tell you whether a rebuild is worth it and, if so, put a quote in writing within 24 hours.